As part of the new steeple roof installation at Nativity of the Blessed Virgin Mary Catholic Church in High Hill, a new 7-foot cross will be installed atop the steeple. The existing cross was not reparable so a new stainless steel cross clad in copper was manufactured and donated by Dennis Venghaus-Schulenburg Sheet Metal. Shown are (from left are Dennis Venghaus, Fr. Luke Prihoda and Forrest Lauher, church maintenance coordinator.